Project Management
Salient points of a successful process plant execution
The aim of any successful project is to achieve consistent trouble-free operation at the rated capacity. Certain pinch points have been identified that must be addressed early in the process to avoid delays. These points are applicable for normal “stick-built” plants and not for plants with a high degree of modularization.
Dow Chemical, Innventure to collaborate on waste-to-value platform
The collaboration aims to enable globally scalable, cost-effective conversion of mixed wastes to petrochemical feedstocks.
Verde Clean Fuels receives $50-MM investment from Cottonmouth Ventures for the potential development of GTG plants in the Permian Basin (U.S.)
Proceeds from the investment are expected to be used to further the development and construction of potential natural gas-to-gasoline production plants in the Permian Basin (U.S.). The proposed plants would produce fully-refined gasoline utilizing Verde’s patented STG+® process from associated natural gas feedstock supplied from Diamondback's operations in the Permian Basin.
thyssenkrupp nucera partners with Chlorum Solutions USA for chlor-alkali plant in the U.S.
Chlorum Solutions USA has chosen thyssenkrupp nucera as its partner to develop its first U.S. chlor-alkali plant in Casa Grande, Arizona (U.S.). thyssenkrupp nucera will oversee the engineering and procurement of the plant’s chlor-alkaline electrolyzer using skid-mounted technology.
Phillips 66 outlines nearly $3-B capital program for 2025
Phillips 66 announced a 2025 capital budget of $2.1 billion, including $998 million for sustaining capital and $1.1 billion for growth capital.
Singapore's ChemOne delays Pengerang complex's start to 2028
Singapore's ChemOne Group has delayed the start of its Pengerang Energy Complex to the fourth quarter of 2028, with construction set to begin by mid-2025, after securing more financing for the project. When completed, the site is expected to house a petrochemical facility that can produce up to 2.6 MMtpy of products such as paraxylene, a feedstock for synthetic fibers and plastic bottles, and 3 MMtpy of fuel products including jet fuel.
Clariant begins construction of second high performance additives production line in Cangzhou, China
Clariant is expanding its Cangzhou production site for the manufacture of the multifunctional additive Nylostab S-EED. The new, second production line in the Hebei Province of China, will jointly be owned and operated by Clariant and its local partner Beijing Tiangang Auxiliary Co., Ltd.
Orlen halts Olefins III project due to ballooning costs
The ORLEN Management Board has decided to halt the Olefins III project after determining that the actual implementation costs would have exceeded the initial estimates by sixfold. The project's cost has ballooned to more than $12 B.
Topsoe to provide technology for 40,000-tpy e-Methanol project in Galicia, Spain
Topsoe to provide e-Methanol synthesis technology and engineering support for the 40,000-tpy e-Methanol Forestal del Atlántico’s Triskelion project in Galicia, Spain.
SwitcH2, CorPower Ocean partner on wave-powered green ammonia
SwitcH2 is partnering with CorPower Ocean to deliver a unique industrial scale floating green ammonia production facility partially powered by wave energy. SwitcH2’s NH3-FPSO unit involves the use of a new built vessel, nearly the size of a VLCC (Very Large Crude Carrier), to support a 300-MW electrolysis plant on deck. The final output is green ammonia

- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
- Towngas to supply green methanol to Golden Island for Singapore bunkering operations 4/8