Alshahrani, Y.
Yasser Alshahrani is a Pump Engineer at Saudi Aramco. He has 7 yr of rotating equipment experience and is a Certified Vibration Analyst: ISO Category II. Alshahrani earned a BS degree in mechanical engineering and an MS degree in engineering management from King Fahad University of Petroleum and Minerals.
Hot oil pump warm-up system best practices and failure case study
Many industries utilize pumps in hot applications, including oil and gas facilities.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
Use infrared thermal imaging for pump system condition monitoring and early failure detection
Thermal imaging technology has evolved over the years, and investment costs have decreased significantly.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fluor signs long-term program management consultancy contract with Saudi Aramco 7/7
- ADNOC signs 15-yr SpA with with INPEX for Ruwais LNG project 7/7
- ADNOC, XRG and Mitsui sign SCA to explore growth opportunities across the energy value chain 7/7
- AMETEK Process Instruments introduces explosion proof 993X series of gas analyzers for Zone 1 applications 7/7
- Draeger launches all-in-one single-entry portal for digital applications, services and support 7/7
- Yokogawa awarded main automation contractor for $13-B Commonwealth LNG project (U.S.) 7/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

