Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF introduces first superabsorbent polymer with product carbon footprint of zero 2/7
- Russia may ban gasoline exports for a month to stabilize prices 2/7
- South Korean petrochemical firms' profits fall in 2024 as oversupply persists 2/7
- Russia's oil transit via Ukraine down 15% in 2024 2/7
- Amogy expands operations to South Korea, strengthening regional presence with key stakeholders to advance its ammonia-to-power solutions 2/7
- U.S. refiner Delek could run more light sweet oil if tariffs bite, CEO says 2/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction