Lopez, J. P.
Juan P. Lopez is a Senior Process Safety Engineer at Bechtel. He has more than 10 yr of experience in process safety, including designing emergency relief systems and participating in process hazard analyses. Lopez earned a BS degree in chemical engineering from Texas A&M University and is a registered professional engineer in the State of Texas.
A simplified dynamic approach for storage tank thermal inbreathing rates
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
Storage tanks that experience sudden heavy rain on what was a hot sunny day can be damaged due to inadequate venting devices.
Use a simple vapor equation for sizing two-phase pressure relief valves
Pressure relief valves (PRVs) protect process equipment from the hazards of excessive over-pressure.
Vapor velocity guidelines for horizontal flare knockout drums
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
Flare knockout (KO) drums are important components of effluent handling systems.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
- Biden administration (U.S.) to release SAF tax credit model 4/26
- Boeing, Wagner advance Australia’s SAF Industry 4/26
- S-Oil expects Q2 refining margins to remain steady then trend upward 4/26
- Vitol to charter supertankers from U.S. to Nigeria's Dangote refinery 4/26
- Refiner Valero beats profit estimates on resilient demand, tight supplies 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction