Sheilan, M.
Mike Sheilan is the Co-founder of Amine Experts and is the Senior Principal Engineer for Amine Experts and Dehydration Experts. For 41 yr, he has provided training and consulting services in hydrate control, gas dehydration, gas and liquid sweetening, hydrocarbon recovery and sulfur plant operations.He is a co-author of the industry reference textbook Amine Treating and Sour Water Stripping.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Westlake Polyethylene achieves ISCC PLUS Certification at Sulphur, Louisiana (U.S.) site 11/7
- Transition Industries, Mitsubishi Gas Chemical sign PSA for ultra-low carbon methanol 11/7
- Malaysia's used cooking oil exports to face pressure in 2026 on domestic SAF production 11/7
- U.S. EPA approves 14 small refinery biofuel waivers 11/7
- China's October crude oil imports rise 8.2% year-on-year, refinery utilization rates highest of year 11/7
- U.S. urges Europe to stick to oil and gas, not renewables 11/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

