Project Management

Project Management: Estimate skid and package dimensions

Consulting Engineer: Abid, J.

In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.

Industry Perspectives: What are the opportunities for the global HPI?

Hydrocarbon Processing Staff: Nichols, Lee

In the February issue of <i>Hydrocarbon Processing,</i> our editors provided the results of <i>Hydrocarbon Processing’s</i> survey on the challenges that the downstream processing industry may face this year.

Petrochemicals: Which network can fulfil the petrochemical sector’s desire to exploit Industry 4.0?

Rajant Corp.: Smith, G.

The global petrochemical industry has not been short of success.

Project Management: Intelligent 3D model for digital project execution

Baker Hughes: Romano, R.  |  Cortesi, M.  |  Magarotto, A.  |  Minnucci, C.  |  Pinto, A.
TechnipFMC: Zannori, R.  |  Tittobello, A.  |  Semeraro, G.

Digital transformation offers the chance to reorganize and develop new models of collaboration that fully leverage the opportunities offered by digital technologies and their benefits across the oil and gas business—particularly for original equipment manufacturers (OEMs) and engineering, procurement and construction (EPC) contractors.

The critical maintenance team: Do you have one?

Consultant: Thorman, G.

Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.

Fabrication of clad equipment and piping—Part 2

Fluor: Shargay, C.  |  Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.
Reliance Industries Ltd.: Panchal, A.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.

Design considerations for rigging and transportation of large process columns

Fluor Daniel India: Sharma, B. K.  |  Bahadur, A.

Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.

The top three causes of contractor and engineering misalignment

Accruent: Eichelberger, N.

When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.

How did asset utilization modeling save Sadara $1 B in capital cost?

Sadara Chemical Co.: Hayek, F.  |  Moran, M.

Sadara is a JV between Saudi Aramco and Dow Chemical.

EPC/construction contracting—Start with the end in mind

Praxair: Ogunye, S.

Large capital projects continue to be challenged by budget issues.