King, M. J.
Improve your choice of process control algorithms
Process Control
/ Process Optimization
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Middle East
/ Safety
This algorithm, when properly tuned, can greatly reduce the quantity of off-spec material made from a process upset. It can be the largest contributor to the benefits captured by improved process control.
Why don’t we properly train control engineers?
Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Information Systems
/ Middle East
While there are managers in the process industry that see training control engineers as a “no-brainer,” these are very much in the minority. They may send staff on courses covering configura..
Are you losing money when tuning controllers?
Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Middle East
Here are 10 rules, if followed, that will result in poor process performance
How to lose money with inferential properties
Fourteen more rules that, if followed, will ensure that advanced control will drive the unit further away from optimum operation
How to lose money with basic controls
Follow these 21 rules to ensure that many opportunities to minimize process disturbances will be completely overlooked
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Neste strengthens chemical recycling logistics infrastructure in Europe with Tepsa Netherlands 10/4
- Enbridge sanctions pipelines to support bp's new deepwater U.S. Gulf of Mexico development 10/4
- Czechs seek partners to challenge EU's CO2 goals for car sector 10/4
- U.S. distillate fuel oil demand will increase in the fall due to agricultural harvest 10/4
- Woodside Energy: Fatality at Beaumont Clean Ammonia project 10/4
- StraightFlo™ reciprocating compressor valve provider rebrands as Atlas Copco 10/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction