Sönmez, M.
Mert Sönmez has been working as an FCC Process Engineer at the İzmir refinery for 1 yr. He has a BS degree in chemical engineering from the İzmir Institute of Technology. His role is tracking the key parameters and running the FCCU to optimum conditions.
Feed nozzle effects on yields and operation of FCCUs
Process Optimization
/ Refining
/ Distillation
/ Engineering & Design
/ Equipment
/ Products
/ Reactors
The first-generation, proprietary feed distributorsa had open-pipe bayonets that were located at the base of the wye section/riser.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction