Saka, A.
Aylin Önder Saka is a Simulation Supervisor at Tüpraş headquarters in Turkey. She has previous experience as an Operations Engineer in oil movements, truck loading/unloading and marine loading/unloading, and as a Refinery Process Supervisor in LPG, SHU, KTU and ARU. She holds MS and BS degrees in chemical engineering from Middle East Technical University in Ankara, Turkey.
Management of LPG pool in a complex refinery
Process Optimization
/ Refining
/ Crude oil
/ Distillation
/ Hydrotreating
/ Loss Prevention
/ Treating
/ Europe
LPG pool management is becoming more important as the regulations on the product specifications tighten.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sherwin-Williams unveils new advanced energy barrier that eliminates threat of corrosion under insulation 6/26
- SIBUR develops new polyethylene grade for beverage packaging 6/26
- IGS launches Rovex, a next-generation robotic cleaning technology for fired heater efficiency 6/26
- A comprehensive technical evaluation of polypropylene technology platforms 6/26
- Sasol and Topsoe to refocus SAF partnership as Zaffra JV prepares for wind-down 6/26
- Indonesia sets 3-month transition period for B50 biodiesel program 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

