Zou, T.
Tong Zou is a Senior Engineering Specialist at T.A. Cook Consultants. He has more than 16 yr of reliability engineering experience in the power generation, automotive, oil and gas and petrochemical industries. Dr. Tong’s expertise includes reliability-centered maintenance, system and component reliability analysis, equipment life data analytics and reliability-based design optimization. Since joining T.A. Cook, he has worked on client projects focusing on reliability improvement.
Risk mitigation procedure following criticality assessment and FMEA
Maintenance & Reliability
/ Process Control
/ Economics
/ Environment
/ Loss Prevention
/ Management
/ Safety
In asset performance management (APM), criticality assessment and failure mode and effects analysis (FMEA) are powerful tools that enable the identification of opportunities to minimize asset lifecycle costs during the development of equipment strategies.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
- Lummus expands R&D capabilities to enhance innovation and water and wastewater technologies 4/17
- Niger plans to build diesel refinery and increase supplies to Mali 4/17
- BASF, SABIC, and Linde celebrate the start-up of the world's first large-scale electrically heated steam cracking furnace 4/17
- U.S. crude stocks rise, gasoline, distillate inventories fall 4/17
- Russia's offline primary oil refining capacity revised up for April 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction