Kim, E.
Eunho Kim is a Junior Engineer on the Stationary Equipment Engineering team at SK energy. He is in charge of the FCCU, and has 5 yr of experience in detailed design and maintenance of equipment. He earned a BS degree in mechanical engineering from Inha University in South Korea.
Case study: Extend tube life in a waste heat boiler
Maintenance & Reliability
/ Refining
/ Boilers
/ Economics
/ Heat Transfer
/ Safety
/ Sulfur
/ Asia/Pacific
The sulfur recovery unit (SRU) separates sulfur from sulfur compounds.
Three topics for operational excellence related to a Cr-Mo hydrotreating reactor
Many end users are trying to use feedstock with higher sulfur content for their refineries to increase profitability, but numerous unknown or plausible bottlenecks exist.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vertex Energy pauses renewable diesel output to switch back to fossil fuels, citing macroeconomic woes 5/10
- Citgo Petroleum reports Q1 profit of $410 MM 5/10
- Golden Pass LNG in discussions with contractor, may delay startup 5/10
- SAFFiRE Renewables biofuel pilot plant to be developed in Kansas 5/10
- EBRD backs Ukraine's green biofuels project with €60-MM loan 5/10
- Russia's refined oil product exports to Singapore to hit highest this year in May 5/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction