Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
- Nigeria's NNPC partners local firm on new 100,000 bpd refinery 4/25
- Stranded cargo shows credit challenges at Nigeria's Dangote refinery 4/25
- Low U.S. distillate consumption reflects slow economic activity and biofuel substitution 4/25
- Clariant catalysts reduce customers’ footprints by 40 million tons of CO2e in 2023 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction