Broad, R.
Robert Broad is a charted chemical engineer, Fellow of the Institution of Chemical Engineers in the UK, and a member of both the International Register of Professional Engineers and the European Federation of National Engineering Associations. Mr. Broad has worked more than 20 yr with compact heat exchangers, focusing on process optimization to reduce energy usage. He holds an MBA from Henley Management College in the UK.
Refinery revamp opportunities with welded plate heat exchangers
Environment & Safety
/ Carbon Management
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Loss Prevention
/ Reactors
/ Safety
The plate-and-shell (P&S) heat exchanger has three significant advantages over the shell-and-tube (S&T) type traditionally used in refinery processes.
Welded plate heat exchangers cut refinery process costs—Part 2
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Loss Prevention
/ Management
/ Natural Gas
/ Products
Plate-and-frame (P&F) heat exchangers were first manufactured 100 yr ago for use in the dairy industry.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Dow Chemical delays construction on multi-billion-dollar Path2Zero project in Fort Saskatchewan, Alberta, Canada 4/25
- Asahi Kasei, Nobian, Furuya Metal and Mastermelt commence joint project to recycle metals, signaling a milestone towards circularity in the chlor-alkali industry 4/25
- India's Delhi plans to curb gasoline car sales, ban gas-guzzling bikes to shed polluter tag 4/25
- Automakers rush to meet surging China demand for long-range hybrids 4/25
- Aster Chemicals to bid for ExxonMobil's Singapore fuel stations 4/25
- Wärtsilä, Höegh Evi and partners complete development of world’s first floating ammonia-to-hydrogen cracker 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction