Ghaisas, N.
Investigate power limitations in a large steam turbine
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Drivers
/ Drying
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Heat Transfer
/ Loss Prevention
/ Management
/ Middle East
/ Motors
/ Polymers
/ Reactors
/ Rotating Equipment
/ Safety
/ Turbines
/ Utilities
/ Valves
An investigation was carried out to rectify power limitations for a steam-turbine driver of a cracked-gas compressor (CGC) in a world-class ethylene plant.DescriptionThe turbine is a nine-stage, impul..
Case history: Improve refrigeration compressor performance
Gas Processing/LNG
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Drivers
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Rotating Equipment
This case examines the mechanical distress and performance deterioration of a critical refrigeration compressor that was installed at a world-scale petrochemicals complex.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OMV receives €450-MM loan from the European Investment Bank for its 140-MW green hydrogen production facility 7/13
- Poland's Unimot says it will supply crude to Germany's Schwedt refinery 7/13
- Hormuz traffic slows to two-month low as renewed U.S., Iran strikes raise safety risk 7/13
- Sinopec deepens aviation fuel push with CNAF restructuring 7/13
- Indian naphtha premiums surge as Gulf, Russian supply tightens 7/13
- Less than a month's supply: Europe's jet fuel stocks are wafer thin as Iran tensions flare 7/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

