Crossland, B.
Bonnie Crossland is a Product Manager for Rosemount gas chromatographs with Emerson. She earned a BS degree in engineering from Rutgers University and an MBA degree from the University of South Carolina, and is also a member of the International Society of Automation (ISA).
40 CFR Part 63: Three possible solutions, one balanced choice
By January 30, 2019, the 40 CFR Part 63 Subpart CC rule by the US Environmental Protection Agency (EPA) requires petroleum refinery owners or operators of flares used as control devices for emissions points to meet the requirements of §63.670, regardless of the construction date of the flare.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- ACC responds to U.S. EPA's final risk management rule for methylene chloride 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
- ClearSign Technologies receives burner contract for California (U.S.) refinery 5/1
- Traders scramble for U.S. storage as distillates demand disappoints 5/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction