Price, B. C.
Reduce air emissions from natural gas vaporization units
New revaporizing method mitigates air pollutant releases while maintaining process efficiency
Developing mid-scale LNG projects from the contractor's perspective
Modular liquefaction methods reduce construction and operating costs for smaller reserve developments
Optimize energy consumption for LNG vaporization
New methods maximize heat transfer to regasify natural gas with minimum environmental impacts
Achieving world-class operating performance
Apply appropriate reliability and operating improvement techniques in an integrated process to match plant capabilities
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Yara to rethink U.S. ammonia project if EU suspends carbon levy 1/16
- Larsen & Toubro wins order for hydrocarbon onshore business 1/16
- Veolia and SBM Offshore partner to deploy near-shore, floating desalination units 1/15
- Formosa Petrochemical extends Taiwan cracker shutdown due to weak derivative margins 1/15
- Cargill advances maritime Decarbonization with delivery of first green methanol dual-fuel vessel 1/15
- Key U.S. energy, power trends at home and on world markets 1/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

