Price, B. C.
Reduce air emissions from natural gas vaporization units
New revaporizing method mitigates air pollutant releases while maintaining process efficiency
Developing mid-scale LNG projects from the contractor's perspective
Modular liquefaction methods reduce construction and operating costs for smaller reserve developments
Optimize energy consumption for LNG vaporization
New methods maximize heat transfer to regasify natural gas with minimum environmental impacts
Achieving world-class operating performance
Apply appropriate reliability and operating improvement techniques in an integrated process to match plant capabilities
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Bio-based aromatics give pathway to drop-in 100% SAF 12/4
- Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection 12/4
- Suez Canal and Scatec sign $1.1-B green methanol MoU 12/4
- Kuwait's al-Zour refinery now fully operational 12/4
- Petroecuador says crude oil output surpasses 400,000 bpd 12/4
- Russia's seaborne diesel exports rose in November with the ban lifted and increased production 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction