Wang, S.
Shu Wang has been with AspenTech for 14 yr and serves as Technology Director and leads the physical properties group to develop and research innovative technologies, such as molecular modeling. Dr. Wang holds a PhD in chemical engineering from the University of Delaware.
Optimize refining operations using plant digital twin based on molecular modeling
A new era of the energy revolution has arrived with the rapid growth of innovative technologies that utilize alternative energy resources, such as electricity, solar, wind and hydrogen, and an increasing demand for sustainable use of natural resources.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction