Gas Processing/LNG
Designing the LNG terminal of the future
New requirements dictate operational flexibility of the design
Are floating LNG facilities viable options?
Here's how to evaluate technological and commercial issues of these units
Consider new approach for floating LNG units
Combined technical expertise for onshore and offshore LNG facilities reduces risks and capital costs for new installations
Minimize risks from cryogenic exposure on LNG facilities
A rational approach investigates methods to protect equipment and infrastructure from liquefied natural gas releases
Consider investing in a standard-compliant process analyzer
High profits are realized with accurate vapor pressure testing
Do you have hard-to-handle gases?
Consider using this second-generation hybrid solvent for treating
Minimize vaporization and displacement losses from storage containers
Consider using this new calculation for recovery
In-line laboratory and real-time quality management
An in-depth look at NIR spectroscopy
What are the opportunities to construct liquefaction facilities at the Arctic Circle?
Building and operating natural gas plants in the high latitudes pose numerous challenges
Which physical solvent is best for acid gas removal?
Four common solvents are compared
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

