Racette, Y.
Yves Racette is Principal Process Optimization Support Engineer at Valero Energy Corp. His areas of expertise are data historian systems and process unit monitoring.
Use advanced predictive analytics for early detection and warning of column flooding events
In this study, a methodology was implemented to predict crude distillation tower flooding events based on key process variables, including product yields, column pumparound (PA) flowrates, column temperatures and overhead reflux flowrate.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- New $1.5-B natural gas pipeline to provide feedstock to Dow's petrochemicals plant and other industrial facilities 5/8
- Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC 5/8
- Seasonal U.S. fuel demand hits pandemic lows, weighs on refining margins 5/8
- Analysis: Shell's Singapore refinery sale and its market significance 5/8
- bp profit slides by 40% as refinery outage offsets higher output 5/8
- ADNOC signs third long-term Heads of Agreement for Ruwais LNG project 5/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction