Bilgi, M. Z.
Mehmet Zaki Bilgi is a Hydroprocessing Engineer at Tüpraş, responsible for the hydrogen production and hydrocracking units at the Kırıkkale refinery. He graduated from Middle East Technical University.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Westlake Polyethylene achieves ISCC PLUS Certification at Sulphur, Louisiana (U.S.) site 11/7
- Transition Industries, Mitsubishi Gas Chemical sign PSA for ultra-low carbon methanol 11/7
- Malaysia's used cooking oil exports to face pressure in 2026 on domestic SAF production 11/7
- U.S. EPA approves 14 small refinery biofuel waivers 11/7
- China's October crude oil imports rise 8.2% year-on-year, refinery utilization rates highest of year 11/7
- U.S. urges Europe to stick to oil and gas, not renewables 11/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

