Putra, Z. A.
is a process engineering and process technology consultant at TMC Chemical in The Netherlands. He has been involved in a wide range of work activities, such as conceptual process designs, feasibility studies, basic engineering design and plant performance evaluations, which include process simulation, optimization and debottlenecking studies. He holds a PDEng degree from Technische Universiteit of Eindhoven.
Improve performance and reduce costs of wastewater treatment plants
The increasing costs of a wastewater treatment plant (WWTP) motivated a major specialty chemical plant to improve the performance of its treatment unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction