Hall, K. R.
Improved equations for the Standing-Katz tables
Using these calculations can predict natural gas density and improve flowrates
The design benefit method: Allocate joint costs among shared products
This accounting technique can provide more accurate results than traditional practices
Consider slotted orifice flowmeters
Accuracy can be an order of magnitude better with less permanent head loss
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Poland's Unimot says it will supply crude to Germany's Schwedt refinery 7/13
- Hormuz traffic slows to two-month low as renewed U.S., Iran strikes raise safety risk 7/13
- Sinopec deepens aviation fuel push with CNAF restructuring 7/13
- Indian naphtha premiums surge as Gulf, Russian supply tightens 7/13
- Less than a month's supply: Europe's jet fuel stocks are wafer thin as Iran tensions flare 7/13
- Russia's diesel export ban deepens global supply crunch 7/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

