Bairamov, A.
Investigation: Failure of a steam generator
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Boilers
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Utilities
In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler
Failure analysis of above-ground storage tank bottom plates
Here are the field performance assessments and remedial measures
Top of line corrosion in industrial wastewater pipelines
Here are the causes and the solution
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sealmatic partners with Saudi Thalate in Saudi Arabia 10/14
- Colonial Oil Industries Marine Division achieves ISCC Plus and EU certifications 10/14
- Fulkrum diversifies its service portfolio with new offerings 10/14
- Kinaxis, ExxonMobil partner to transform energy sector supply chains 10/14
- Phillips 66 agrees to sell interest in Switzerland-based joint venture 10/14
- Nigeria signs deal to supply gas to proposed $3.5-B petrochemical plant 10/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction