Schultes, M.
How sensitive is your treating plant to operating conditions?
A normal expectation in the course of operating an amine treating plant for acid gas removal is that small changes in operating conditions will result in correspondingly small responses in plant performance. However, such expectations are not always well founded. To establish credibility for the process simulator used in the design of a new LNG plant, the mass-transfer rate-based simulation results for the new plant are compared with performance data from an operating LNG plant.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- GTT receives order from Samsung Heavy Industries for the tank design of two new very large ethane carriers 2/11
- Emerson introduces hybrid continuous gas analyzer for improved regulatory compliance and emissions control 2/11
- BASF to further strengthen Global Business Services through global hub setup 2/11
- Morocco signs agreement with ORNX consortium for $4.5-B green ammonia complex 2/11
- Rosneft oil refinery in Germany warns of risks from U.S. sanctions 2/11
- TotalEnergies takes over Zeeland refinery operations, Lukoil still owns 45% 2/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

