DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Managing reliability and asset management performance in the Yanbu refinery through the implementation of a reliable operations committee program 1/16
- AM Green and DP World join forces to establish India as global hub for green molecules 1/16
- Toyota unit Hino Motors reaches $1.6-B U.S. diesel emissions settlement 1/16
- Update: Colonial Pipeline's main U.S. gasoline artery likely shut until Friday 1/16
- EIA: U.S. crude stocks fall, gasoline and distillate inventories rise 1/16
- South Korea considering buying more U.S. oil and gas 1/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction