Sood, A.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sinopec's $4.5-B refinery in Sri Lanka to challenge India's fuel export market share 4/30
- Topsoe secures first SAF project in China 4/30
- Borouge increases Q1 net profit nearly 40% to $273 MM 4/30
- NEXTCHEM finalizes acquisitions of HyDEP and Dragoni to boost green H2 production tech 4/30
- Sponsored Digital Feature: Cut the carbon and boost sustainability 4/30
- Merichem Technologies enhances sulfur treatment capabilities with acquisition of Chemical Products Industries 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction