Lee, B. D.
Ba-Da Lee has a BS degree in chemical engineering from Hanyang University, Seoul, Korea. He is a process engineer at GS E&C in Seoul, and is working on several EPC projects for petrochemical plants. He also has engineering experience with separation equipment, such as trays and packing, and mist eliminators.
Exploiting classic design heuristics for DWC design and optimization
The history of the refinery and petrochemical industry is filled with a variety of challenges, followed by the development of state-of-the-art technologies to overcome those hurdles. New legislation has required more environmentally friendly product specifications, while energy costs have kept rising.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- ACC responds to U.S. EPA's final risk management rule for methylene chloride 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction