Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Dow Chemical delays construction on multi-billion-dollar Path2Zero project in Fort Saskatchewan, Alberta, Canada 4/25
- Asahi Kasei, Nobian, Furuya Metal and Mastermelt commence joint project to recycle metals, signaling a milestone towards circularity in the chlor-alkali industry 4/25
- India's Delhi plans to curb gasoline car sales, ban gas-guzzling bikes to shed polluter tag 4/25
- Automakers rush to meet surging China demand for long-range hybrids 4/25
- Aster Chemicals to bid for ExxonMobil's Singapore fuel stations 4/25
- Wärtsilä, Höegh Evi and partners complete development of world’s first floating ammonia-to-hydrogen cracker 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction