Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals begins operation of chlor-alkali plant using thyssenkrupp nucera technology 6/16
- MAIRE, Azerbaijan partner to increase sustainability projects in Azerbaijan 6/16
- Mitsubishi Gas Chemical, RITE partner to convert captured CO2 into methanol 6/16
- Yara Clean Ammonia supports groundbreaking ammonia bunkering pilot in Pilbara (Australia) 6/16
- Syensqo signs carbon fiber composites recycling contract with Fairmat 6/16
- OCI Global receives U.S. regulatory approval for the sale of its global methanol business to Methanex Corp. 6/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction