Tan, P. C.
Pui Chew Tan is Manager, Instrumentation and Control, and has been working with Dialog E&C Sdn Bhd for 9 yr. Prior to that, he had several roles as an electrical and instrument maintenance engineer in a power station, a DCS and PLC programmer, and as an application engineer with General Electric. Tan earned a degree in electrical engineering from Melbourne University.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia to aid hurricane-hit Cuba with diesel fuel 11/8
- SABIC opens ULTEMâ„¢ resin manufacturing facility in Singapore 11/8
- U.S. refiners hold output at high levels as fuel inventories sag 11/8
- Catalyxx secures $5.8-MM Series A equity round to advance green chemistry technology 11/8
- Neste changes its guidance due to unplanned shutdown of Rotterdam refinery 11/8
- Repsol launches Nexa, the commercial brand of its 100% renewable premium diesel in service stations 11/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction