Poussin, G.
Guillaume Poussin is the Group Managing Director at CREALYST-Group. He has more than 15 yr of experience in the study and development of technologies concerning particle behavior during filling processes of cylindrical vessels for different applications (e.g., for catalysts and adsorbents and the agricultural storage of grain).
Solving maldistribution: Catalyst loading and why it matters
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Reactors
/ Americas
/ Europe
Are your reactor yields lower than forecast? Does your fixed-bed catalytic reactor suffer from hotspots?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Enterprises to sell Composites business to KPS Capital Partners for €1.7 B 12/3
- Small volumes of renewable diesel are now consumed on the U.S. East Coast 12/3
- Russia's December idle oil refining capacity revised up 60% 12/3
- Fuel oil smuggling network rakes in $1 B for Iran and its proxies 12/3
- Taiwan's Formosa operates refinery at reduced rate due to maintenance 12/3
- Russia lifts gasoline export ban for producers 12/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction