Brown, L.
Lynn Brown has 40 years of operations and design experience in refining, petrochemicals, gas processing and production at Worley Parsons, Unocal, Jacobs and Fluor. Her primary expertise is in operations, instrumentation reliability, and design and revamp of crude units, desulfurizers and distillation systems.
Upgrading the bottom of the barrel
Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment & Safety
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Products
/ Pumps
/ Reactors
/ Sulfur
/ Treating
/ Utilities
/ Refining
In the past few decades, new technologies, including both carbon rejection methods and catalytic conversion methods, have emerged.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- WinGD secures world-first ethanol-fueled engine orders for ocean-going ships 5/19
- Aster to invest $80 MM to expand ethylene export capacity at complex in Singapore 5/19
- Energy Transfer withdraws air permit application for $1.8-B petrochemical complex in Texas 5/19
- Green eFuels Producers receive financial backing for first-of-its-kind wastewater-to-green-methanol plant 5/19
- Coega awards electrolyzer cell technology deal to Topsoe for $5.8-B South African green ammonia project 5/19
- bp comments on union's walkout during Whiting refinery workforce negotiations 5/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

