Eskandarlu, A.
a mechanical engineering graduate from Azad University, has been actively involved in the area of rotating and packaged equipment engineering since 2005. Since he joined Chagalesh Consulting Engineers in 2008, he has been engaged in many hydrocarbon processing projects as a machinery lead engineer. He holds a head position in the machinery department of Chagalesh and is also an instructor of pump and compressor courses.
Compare pitot tube pumps with high-speed centrifugal pumps for low-flow applications
When seeking a pump for a low-flow, high-head application, there is a temptation to choose a high-speed (HS) integral gear-driven centrifugal pump because of its advantages over multi-stage centrifugal and other types of pumps.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- ACC responds to U.S. EPA's final risk management rule for methylene chloride 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
- ClearSign Technologies receives burner contract for California (U.S.) refinery 5/1
- Traders scramble for U.S. storage as distillates demand disappoints 5/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction