Choudary, N. V.
What are the corrosion issues for gasohol?
New study investigates metal deterioration from ethanol-blended gasoline
Reevaluate the activity of your catalyst system
Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Catalysts
/ Europe
/ Middle East
Selecting optimum conditions for fluid catalytic cracking requires micro activity testing through an improved method
Fine-tune catalyst addition rates
Simple method dynamically optimizes E-catalyst activity in fluid catalytic crackers
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Neste strengthens chemical recycling logistics infrastructure in Europe with Tepsa Netherlands 10/4
- Enbridge sanctions pipelines to support bp's new deepwater U.S. Gulf of Mexico development 10/4
- Czechs seek partners to challenge EU's CO2 goals for car sector 10/4
- U.S. distillate fuel oil demand will increase in the fall due to agricultural harvest 10/4
- Woodside Energy: Fatality at Beaumont Clean Ammonia project 10/4
- StraightFloâ„¢ reciprocating compressor valve provider rebrands as Atlas Copco 10/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction