Nava, J.
Optimize operating parameters of absorbers/strippers in gas plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gas to liquids (GTL)
/ Heat Transfer
/ Middle East
/ Naphtha
Better recovery definition of C3s and C4s from gas absorber/stripper can lower costs
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Holland America starts pilot tests using renewable fuels on cruise liner 5/3
- U.S. admin sets path for ethanol aviation fuel subsidies 5/3
- Ryazan refinery (Russia) hit by drone strike 5/3
- Novatek's new Ust-Luga condensate unit set for June testing 5/3
- Thiozen pilot successfully produces zero-emission H2 from sour gas waste streams 5/3
- Mexico's Pemex exported 20,000 bpd of crude, fuel to Cuba in H2 2023 5/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction