Oleszczuk, G.
has worked in control and optimization industrial processes for 15 years, with more than eight years at Honeywell as an advanced solutions operation leader. He has implemented several APC and OTS solutions across Europe and North Africa. Dr. Oleszczuk gained his PhD in automation and dynamics at Old Dominion University in Virginia, and an MSc degree in chemical engineering and automation control at Warsaw University of Technology in Poland. He specializes in process dynamics modeling.
Utilize APC solutions to resolve hydrocracker conversion optimization challenges
Petrochemicals
/ Process Control
/ Refining
/ Diesel
/ Hydrocracking
/ Information Systems
/ Naphtha
Improving profits and reducing costs remain priorities for owner/operators and management.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction