Rotating Equipment
Segregated and integrated process and antisurge compressor control systems
A proven design eliminated control interactions in this ethylene cracker facility
Consider regenerative pumps for low-flow/low-NPSH applications
In low-flow applications they use less horsepower when 'curve run-out' is considered
Oil mist system provides rapid payback
Benefits included lower maintenance costs and reduced lost production
Improved pump hydraulic selection reduces cavitation risk
Follow these guidelines to improve reliability
Hybrid fault patterns for diagnosing gas turbine component degradation
Faults and their locations can be identified by analyzing efficiency and vibration simultaneously
Boost gas turbine performance by inlet air cooling
Use these guidelines to evaluate the options
Gas turbine fuel nozzle refurbishment
Follow these guidelines to improve reliability and reduce emissions
How piston ring design affects dry-running hydrogen compressor capacity
Tests reveal the best choices
Integral gas engine compressor failures and solutions
Here are the causes and how to remedy them
Hazardous situations created by improper piping analyses
Some computer programs do not handle hot condition calculations correctly
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

