Rotating Equipment
Modern online monitoring systems for piston compressors
Combining control and data collection improves performance and reduces costs
Consider diaphragm pumps for high environmental demands
Other benefits include lower maintenance costs and higher efficiency
Realistically assess reciprocating compressor foundation and mounting system loads
Common assumptions about frame flexibility can result in miscalculating forces
Implement a steam turbogenerator fault detection and diagnosis system
Identify and correct faults before they cause catastrophic failures
A quick guide to compressor suction knockout drum sizing
Mist eliminator and gravity settling methods are reviewed
Understand root causes of gearbox failure
Case histories illustrate the importance of preventive maintenance
Increase power and efficiency of LNG refrigeration compressor drivers
All-electric-driven plants can offer many benefits
Pregrouted baseplates reduce installation time and costs
Improving pump reliability is another benefit
Condition monitoring for reciprocating compressors
Practical experience with computer-aided online systems shows how useful they can be
Avoid open impeller failures
Numerical methods can help determine causes of failure
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

