Rotating Equipment
Analytical calculation of Fanning friction factor
The Colebrook equation can be solved by using the Lambert W function. Algorithmic routines are also given to do the calculation
Selecting turbine oil filtration systems
Follow these guidelines to improve reliability
Avoid refrigeration compressor damage
Online monitoring helps prevent liquid injection and operating in choke
Ultrasonic multipath flowmeters for liquid hydrocarbon custody transfer
They reliably meet or exceed demanding accuracy standards
Apply proven machinery problem-solving strategies *
Here's a summary of the approach used by competent machinery engineers
Matching antisurge control valve performance with integrated turbomachinery control systems
Optimize plant performance by improving compressor efficiency, availability and protection
Coupling retrofits and upgrades
Here are the considerations for applying nonlubricated, high-performance types
Avoid cavitation in butterfly valves
Use these coefficients to determine safe throttling positions
Understand cavitation in reciprocating pumps
Use these guidelines to help avoid problems
Pitfalls of operating pumps at part load
The risk in terms of reduced reliability and safety is not worth it
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction