Rotating Equipment
Understand cavitation in reciprocating pumps
Use these guidelines to help avoid problems
Pitfalls of operating pumps at part load
The risk in terms of reduced reliability and safety is not worth it
Troubleshooting repetitive failure of a CO2 ompressor rotor
Here's how the plant personnel overcame the unique and complex problem of residual magnetism
Use ejectors to reduce operating costs
Here are some uncommon applications for the technology
A simple way to estimate equipment pressure drops
The equivalent line length method can be used to estimate equipment pressure drop at different operating conditions
Root-cause failure analysis applied to a gas turbine failure
This case study illustrates the method
Retrofitting pillow-block bearings with optimized oil mist lubrication
This refinery significantly increased bearing life
Reliability driven asset management strategy for reciprocating compressors
Use these methods to reduce mean-time-to-repair and increase availability
Oil mist lubrication for electric motors
Use these guidelines to improve reliability and efficiency
Combine troubleshooting and continuous monitoring of dynamic data for critical machinery
Advanced systems provide more data and increase reliability
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

