Furnaces

HP Water Management: Avoid failures in water projects: Part 2

MarTech Systems, Inc.: Huchler, L. A.

Last month, we discussed the need for project engineers to talk to process engineers about the water systems as a capital project takes shape. This month’s column discusses additional ways to bri..

Achieve optimal heat recovery in a kettle exchanger

Consultant: Das, T.

Improve operations by avoiding buildup of sensible duty or by using baffles

Debottleneck crude-unit preheat exchanger network inefficiencies

Saudi Aramco: Al-Zahrani, S.  |  Bright, E.  |  Roy, S.

Simulation models can be effectively used to optimize heat transfer and boost operational performance

Selecting the right steam methane reformer: Can vs. box design

Linde Engineering North America, Inc.: Shahani, G.
Linde Engineering: Schoerner, W.
Hydro-Chem: Musich, N.

Simulating various configurations and cost estimates aids in the selection of a steam methane reformer for hydrogen production

Investigation: Failure of a steam generator

SABIC R&T: Babakr, A.  |  Bairamov, A.

In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler

HP Water Management: Don’t let water be the reason for a turnaround

MarTech Systems, Inc.: Huchler, L. A.

Several years ago, while arriving onsite during another unit turnaround, I joked to a process engineer at the refinery “I get it. . . every time I ‘turn around,’ you have a turnaround.&..

Foster Wheeler inks CFB technology license in India

Foster Wheeler announced today that its Global Power Group subsidiary has entered into a 20-year agreement with Essar Projects India Ltd. (EPIL), a subsidiary of Essar Group, to provide a technology license for utility-sized circulating fluidized-bed (CFB) steam generators to be sold in India.

Koppers to supply liquid carbon pitch for Rio Tinto smelters in Australia

Koppers Holdings and Rio Tinto Aluminium have agreed to a 42-month contract extension that began on January 1, 2011, and continues through June 30, 2014. Under the terms of the agreement, Koppers will supply and transport liquid carbon pitch to Rio Tinto smelters in Australia at an estimated value in excess of $100 million.

Accurate feedstock selection and planning are critical to profitability

Honeywell Hi-Spec Solutions: Adams, D. J.
Maruzen Petrochemical: Funahashi, K.  |  Kobayashi, H.
Yamatake: Saiki, K.  |  Suzuki, M.

Linear programming plays a vital role for ethylene producer

Meeting diesel specifications at sustained production

Shedded Uhde Pty Ltd.: Singh, D.

New approach rethinks operations of crude and vacuum distillation units to recover more distillate