Pelham, R. O.
Improve the performance of your existing steam system
This discussion tracks a material flow through the steam system, starting with feed and continuing with steam generation, steam uses and, finally, condensate recovery.
Improve your plantwide steam network
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Boilers
/ Corrosion
/ Economics
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Safety
/ Utilities
/ Valves
When optimizing an existing steam network, design and process engineers need a complete understanding of all aspects of the existing system. Accurate energy and material balances must be established.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction