Furnaces

Improve the performance of your existing steam system

Merrick & Co.: Pelham, R. O.

This discussion tracks a material flow through the steam system, starting with feed and continuing with steam generation, steam uses and, finally, condensate recovery.

Improve your plantwide steam network

Merrick & Co.: Pelham, R. O.

When optimizing an existing steam network, design and process engineers need a complete understanding of all aspects of the existing system. Accurate energy and material balances must be established.

HP Innovations

Hydrocarbon Processing Staff: Blume, Adrienne

FLNG needs offshore know-howMore and more developers are considering floating liquefied natural gas (FLNG) as a strong option for monetizing gas resources. The sustained work over the last five years ..

HP Integration Strategies: The energy water nexus

ARC Advisory Group: Miller, Paul

Whether or not you subscribe to the global warming and “peak oil” arguments, it is clear to almost everyone in the industrial world that “business as usual” is not sustainable inde..

HP Innovations: Innovations

Hydrocarbon Processing Staff: Blume, Adrienne

Neste Oil makes progress on microbial oil plantFinland’s Neste Oil recently completed the first phase of a pilot plant for producing microbial oil. The €8 million plant is expected to be com..

Identify and control excess air from process heaters

Bechtel Corp.: Ahamad, S.  |  Vallavanatt, R.

Process heaters are the largest consumers of energy in most plants. A refinery, on average, burns approximately 2 billion Btu/hr of fuel in fired heaters. The total quantity of fuel burned (heat relea..

What are the benefits of rigorous modeling in heat exchanger design?

Aspen Technology Inc.: Cazenave, J.

This article examines three applications where rigorous heat exchanger models can boost value derived from process simulation and provide more accurate results.

Prevent external corrosion of boiler tubes under refractory lining

SABIC Technology Centre: Maity, M.  |  Biramov, K.  |  Al-Zahrani, E.
Eastern Petrochemical Co.: Kareem, M. A.

A leak developed on the water wall for several boiler tubes within five months of the commissioning of a plant boiler. In this case, the boiler tubes were partially covered with a castable refractory ..

Largest ethane cracker: Borouge’s Ruwais manufacturing complex

Hydrocarbon Processing Staff: Romanow, Stephany

The latest expansion project includes an ethane cracker (EU3), two PE and two PP plants, and a low-density PE (LDPE) unit.

HP Engineering Case Histories: Case 69: Heat-up rate and rubs on a steam turbine

Consulting Engineer: Sofronas, A.

This column has suggested using simple analytical models to troubleshoot equipment. However, in some cases, a more detailed solution may be required. The following case histories examine the heat up o..