Furnaces
Selecting the right steam methane reformer: Can vs. box design
Simulating various configurations and cost estimates aids in the selection of a steam methane reformer for hydrogen production
Investigation: Failure of a steam generator
In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler
HP Water Management: Don’t let water be the reason for a turnaround
Several years ago, while arriving onsite during another unit turnaround, I joked to a process engineer at the refinery “I get it. . . every time I ‘turn around,’ you have a turnaround.&..
Foster Wheeler inks CFB technology license in India
Foster Wheeler announced today that its Global Power Group subsidiary has entered into a 20-year agreement with Essar Projects India Ltd. (EPIL), a subsidiary of Essar Group, to provide a technology license for utility-sized circulating fluidized-bed (CFB) steam generators to be sold in India.
Koppers to supply liquid carbon pitch for Rio Tinto smelters in Australia
Koppers Holdings and Rio Tinto Aluminium have agreed to a 42-month contract extension that began on January 1, 2011, and continues through June 30, 2014. Under the terms of the agreement, Koppers will supply and transport liquid carbon pitch to Rio Tinto smelters in Australia at an estimated value in excess of $100 million.
Accurate feedstock selection and planning are critical to profitability
Linear programming plays a vital role for ethylene producer
Meeting diesel specifications at sustained production
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Foster Wheeler sending a steam reformer to Bashkortostan
Foster Wheeler AG’s Global Engineering and Construction Group has been awarded a contract by JSC Novo-Ufimsky refinery, a subsidiary of Russian oil company Bashneft, for the engineering and material supply of a new Terrace Wall steam reformer heater and air preheating system for the Ufa refinery in the Republic of Bashkortostan, Russia.
Alfa Laval wins SEK 75 million refinery order in Saudi Arabia
Alfa Laval has received an order for Alfa Laval Packinox heat exchangers to a refinery in Saudi Arabia. The order value is about SEK 75 million and delivery is scheduled for 2012.
Minimize carbon footprint from Claus tail-gas units
Reevaluate emissions efficiencies on sulfur-removal operations
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
- Day 2 of WGLC 2024 begins with Chevron speaker’s inspiring, relatable message 11/21
- MOL Group, KazMunayGas partner on exploring petrochemical production 11/21
- WGLC: Innovating AI adoption 11/21
- Solvay uses waste wood to power soda ash and bicarbonate plant in Germany 11/21
- Syensqo expands U.S. production capacity for advanced polymers 11/21