Al-Enazi, S.
Mitigate reactor failures due to graphitization
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Reactors
/ Safety
Graphitization occurs in carbon steel (CS) reactors in high-temperature service (> 455°C). As discussed in this case history, the shell of a methyl tertiary butyl ether (MTBE) reactor became s..
Investigation: Failure of a surface condenser titanium tube
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Piping
Advanced analytic methods determine contributing factors in heat exchanger corrosion problem
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction