Al-Enazi, S.
Mitigate reactor failures due to graphitization
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Reactors
/ Safety
Graphitization occurs in carbon steel (CS) reactors in high-temperature service (> 455°C). As discussed in this case history, the shell of a methyl tertiary butyl ether (MTBE) reactor became s..
Investigation: Failure of a surface condenser titanium tube
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Piping
Advanced analytic methods determine contributing factors in heat exchanger corrosion problem
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

