Project Management
Case 68: Pneumatic testing dangers
Use caution on what defines a true ‘safe distance’
2012 petrochemical outlook: United States
The boom in oil and gas is creating both demand side (e.g., pipe mills, oilfield machinery) and supply-side (e.g., chemicals, fertilizers, direct iron reduction) opportunities.
HP Insight: The HPI uses technology when solving global problems
Research and development (R&D) has been the platform to support new methods to process transportation fuels and petrochemical products from hydrocarbons. So, how much of the R&D was just straight rese..
HP Construction: North America
Fluor Corp. was awarded an engineering, procurement and construction management (EPCM) contract by Joule to design and build a renewable fuel production facility in New Mexico. The facility is intende..
HP Construction: Latin America
The Siemens Industry Automation Division will equip the Refineria de Cartagena S.A. (Reficar) refinery in Cartagena, Colombia, with an integrated water-treatment solution that is to form the heart of ..
HP Construction: Europe
BASF will increase its capacity for cyclohexane oxidation at its Antwerp Verbund site by about 50,000 tpy. The total investment amounts to about €10 million. Cyclohexane oxidation products are im..
HP Construction: Middle East
W. R. Grace & Co. has signed a memorandum of understanding to form a joint venture (JV) with Al Dahra Agricultural Co. to build and operate a fluid catalytic-cracking (FCC) catalysts and additives pla..
HP Construction: Asia Pacific
Jacobs Engineering Group Inc. has a contract from Solvay for a major, specialty polymers production plant to be built at Solvay’s industrial site in Changshu, Jiangsu, China. Officials estimate t..
Foster Wheeler lands project management deal for Abu Dhabi aromatics facility
Foster Wheeler has been awarded a contract by Abu Dhabi National Chemicals Co. (ChemaWEyaat) for project management consultancy (PMC) services on an aromatics complex and supporting infrastructure. The PMC services are for the front-end design (FEED) phase of the ChemaWEyatt project.
Sempra taps Foster Wheeler for engineering work on Cameron LNG export site
Work scope for the Cameron LNG liquefaction site of Sempra Energy includes technical assistance for project development and execution of front-end engineering.
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5

