Banerjee, P.
Implementing advanced process control on ammonia plants
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Safety
Benefits exceeding the guarantee were realized through APC by simultaneously stabilizing and optimizing the plant in the presence of significant feed density variations that impact the entire plant operation
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrovietnam says supertanker with Iraqi oil arrives at refinery port 6/1
- Russia bans aviation fuel exports until November 30 6/1
- Green Fuels Operating breaks ground on $400-MM refinery in Oklahoma (U.S.) 6/1
- SABIC puts 141 lots of industrial assets up for public auction 6/1
- Digital Exclusive: Margin left on the table: The hidden cost of supply chain capability gaps in hydrocarbon processing—Part 1 6/1
- bp sells 5% stake in Australian Browse LNG project to South Korea's GS Energy 6/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

