Information Systems
Practical process control system metrics
Here are several useful examples
Agile supply chain planning
Providing a common workspace improves data integration
Service-oriented architecture simplifies data source integration
Here's how the approach helps refinery scheduling and also contributes to business-wide SOA adoption
Predicting octane numbers for gasoline blends using artificial neural networks
The ANN models were more accurate than regression models
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
Computational fluid dynamics simulation of solid–liquid slurry flow
The resulting model's predictions showed reasonably good agreement with the experimental data
Genetic algorithm tuning improves artificial neural network models
The technique is illustrated by predicting hold-up of slurry flow in pipelines
Align HPI operations to economics
Clifftent optimizes risky tradeoffs at limits
Predicting important parameters using artificial neural networks
Consider them for complex nonlinear processes
Redesign of a compressor antisurge control loop using dynamic simulation
The new design solved the two-phase flow problem
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

