Information Systems
Improve speed and convergence of distillation column simulation
The proposed bounding method significantly improves performance
Improving refinery reliability, performance and utilization
A new digital control system incorporating fieldbus provided substantial benefits
Gage multivariable predictive control motility to guide support
Manipulated variable analysis is much simpler than controlled variable analysis for determining controller health
Probabilistic alarm management
A procedure using Markov chains provides insights based on HAZOP report information
Optimizing wireless systems in hydrocarbon processing plants
Here's how to manage the many disparate technologies
Intrinsically safe fieldbus for hydrocarbon processing plants
The key issue is delivering enough power to a large number of field devices
Effective pH control through intelligent automation
This technology can improve reliability while reducing operating costs
Zero-lag exponential moving average for real-time control and noisy data processing
The filtering technology has no time delay
Model-free adaptive control technology enables ethylene quench water pH control
PetroChina has improved ethylene production efficiency and plant safety
Controlling hydrocracker reactor temperature
Avoid safety incidents and runaway reactions
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

